ComNet Networks and Security Inc. has agile, scalable resources to deploy across Canada—from managing smaller network installation and integration projects (2-3 weeks) to completing complex, multi-year, multimillion-dollar projects.
MUSH Sector Projects
Hybrid Heritage New Build
Size | Location | Duration
190,000 sq. ft. | Kingston, Ontario | 16 months
Services
- Worked closely with engineers to plan cable paths through the existing foundations.
- Installed five Cat6 structured copper and fibre backbones for telecommunications rooms on every floor of the four-storey building—resulting in 1,400 Cat6 cables for voice, data, wireless, CCTV and A/V.
- Installed two copper and fibre backbones in adjoining buildings.
Certification
Yes, 25 years
High-Density Wireless Mesh Upgrade – 3 Campuses
Locations | Duration
Brockville, Cornwall and Kingston | 15 months
Services
- Installed Cat6A structured cabling, wireless hardware and termination hardware in all main buildings—a total of 30 communications rooms, 1,400 cables and 720 wireless access points across three campuses.
- Upgraded UPS equipment.
- Completed major upgrades to PoE switching and rolled out wireless controllers.
- Removed all existing wireless devices and associated Cat5e cabling.
- Additional Wi-Fi verifications (heat mapping) and upgrades in 700 spaces.
- Completed during full occupancy.
Certification
Yes, 25 years
High School – CCTV Security System Installation
Value | Location | Duration
$35,000 | Kingston, Ontario | 4 weeks
Services
- Installed 50 CCTV cameras and a certified video management system to enable network video recording (NVR) as well as remote access and viewing.
- Recommended equipment options that provided the desired high-quality images at a 30% lower cost.
- Provided shop drawings to the school board and engineers.
- Scheduled and installed the security system outside of school hours to minimize disruptions to classes and after-school events.
- Provided end user and administrative training.
Certification
Yes, 25 years
Corporate / Industrial Projects
New Construction – Food Manufacturing Facility
Size | Location | Duration
320,000 sq. ft. | Kingston, Ontario | 6 months
Services
- Installed structured cabling (voice, data and security), wireless access points (Wi-Fi) and CCTV cameras.
- Installed 10 fibre optic backbones in the main facility and the accompanying water treatment plant, over 300 horizontal Cat6 cables, 80 CCTV cameras, and 100 wireless access points.
- Partnered with a security systems integrator.
Certification
Yes, 25 years
Fit Up – Communication Cabling, Security and AV
Value | Location | Duration
$160,000 | Ottawa | 2 months
Services
- Supplied, installed and certified over 860 Cat6 cables for workstations on two floors of the facility.
- Supplied and installed fibre and copper backbones between closets.
- Installed audio-visual equipment (projectors, screens, speakers, etc.).
- Installed a robust security system (access control, intrusion, CCTV) that included 50 doors and 25 cameras linked to our client’s corporate headquarters in another country.
- Worked closely with internal teams to program the security systems to meet corporate standards.
Certification
Yes, 25 years
Government Projects
Security Surveillance – Provincial Courthouse
Value | Location | Duration
$350,000 | Kingston, Ontario | 12 months
Services
- Provided an end-to-end security surveillance solution: inventory, installation, programming, configuration, activation, testing, identification, labelling, and documentation services.
- Installed communication cabling and integrated multiple cameras on a security centre platform to provide live, recorded, high-definition video for optimal situational awareness.
- Added custom door control and an emergency duress system.
- Completed some component and system cutovers after hours to minimize disruptions and meet tight timelines.
Certification
Yes, 25 years
National Project – Crown Corporation
Value | Location | Duration
$1.6M | Across Canada | 12 months
Services
- Supplied, installed and tested Category 6 structured cabling for all offices, retail outlets and distribution centers across Canada.
- Included installation of all paging systems and electrical requirements.
Certification
Yes, 25 years
Urban Structures Projects
550,000 Sq. Ft. Stadium and Civic Centre
Value | Location | Duration
$1.6M | Ottawa, Ontario | 32 months (intricate staging schedule)
Services
- Supplied and installed communication cabling in new and renovated portions of a multibuilding project (parkade, stands, civic centre, common spaces, service kiosks, advertising monitors).
- Installed Wi-Fi network and communication cabling for all major TV broadcasters.
- Coordinated with trades, tested, labelled, and installed several cabling systems (voice and data, Wi-Fi, A/V, security, and CCTV).
- Rewired a heritage building that was moved 100 meters from its original position.
- Integrated hundreds of security cameras/CCTV and wired door systems, HID multiclass card readers, intrusion systems, emergency phone stations, intercom and mass notification systems.
Certification
Yes, 25 years
Infrastructure Projects
Blown Fibre Optic Bundle – International Bridge
Value | Location | Duration
$25,000 | Queenston, Ontario and Lewiston, New York | Summer
Services
- Worked in conjunction with a U.S. contractor to pressure test and replace the tube cable that spanned the international bridge.
- Jointly blew a replacement fiber bundle across the bridge and fusion splicing fibre strands.
- Performed final optical time-domain reflectometer (OTDR) testing to get the fiber optic back bone cable commissioned.
Certification
Yes, 25 years